KIWIFRUIT PROCESS ENGINEERING
Inspection, Installation and Commissioning Scope
Define inspection points, installation interfaces, commissioning material and acceptance responsibilities for the selected line.
Inspect the selected equipment
Use the selected equipment list and drawings to agree construction, access and connection checks. Identify any inspection, witness activity or acceptance documentation you need in the project scope.
Prepare the site
Foundations, access, utilities, drains, lifting and adjacent equipment need named responsibilities before arrival.
Commission against agreed inputs
Commissioning depends on available material, utilities, package and acceptance methods. FAT, SAT, training and service are included only when the quotation states their scope.
START WITH THE PRODUCT YOU WANT TO MAKE
Let's find the right route for your project.
Share your incoming material, production target and package. Request a focused proposal for the equipment and connections you need.